현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용성 분석 연구Feasibility Study of Application BIM Simulation System to Mock-up Site
- Other Titles
- Feasibility Study of Application BIM Simulation System to Mock-up Site
- Authors
- 장세준; 윤석헌; 윤준선; 백준홍
- Issue Date
- 2007
- Publisher
- 대한건축학회
- Keywords
- BIM; 4D; Mock-up; 3D; BIM; 4D; Mock-up; 3D; 건축정보모델링; 4차원 CAD; 간섭관리시스템; 시공성 분석攀 * 연세대 건축공학과 대학원 석사과정
- Citation
- 대한건축학회논문집 구조계, v.23, no.10, pp 131 - 138
- Pages
- 8
- Indexed
- KCI
- Journal Title
- 대한건축학회논문집 구조계
- Volume
- 23
- Number
- 10
- Start Page
- 131
- End Page
- 138
- URI
- https://scholarworks.gnu.ac.kr/handle/sw.gnu/28661
- ISSN
- 1226-9107
- Abstract
- Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator‘s satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - 공과대학 > School of Architectural Engineering > Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.