Cited 0 time in
현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용성 분석 연구
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 장세준 | - |
| dc.contributor.author | 윤석헌 | - |
| dc.contributor.author | 윤준선 | - |
| dc.contributor.author | 백준홍 | - |
| dc.date.accessioned | 2022-12-27T07:09:00Z | - |
| dc.date.available | 2022-12-27T07:09:00Z | - |
| dc.date.issued | 2007 | - |
| dc.identifier.issn | 1226-9107 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/28661 | - |
| dc.description.abstract | Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator‘s satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. | - |
| dc.format.extent | 8 | - |
| dc.publisher | 대한건축학회 | - |
| dc.title | 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용성 분석 연구 | - |
| dc.title.alternative | Feasibility Study of Application BIM Simulation System to Mock-up Site | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 대한건축학회논문집 구조계, v.23, no.10, pp 131 - 138 | - |
| dc.citation.title | 대한건축학회논문집 구조계 | - |
| dc.citation.volume | 23 | - |
| dc.citation.number | 10 | - |
| dc.citation.startPage | 131 | - |
| dc.citation.endPage | 138 | - |
| dc.identifier.kciid | ART001090377 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | 4D | - |
| dc.subject.keywordAuthor | Mock-up | - |
| dc.subject.keywordAuthor | 3D | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | 4D | - |
| dc.subject.keywordAuthor | Mock-up | - |
| dc.subject.keywordAuthor | 3D | - |
| dc.subject.keywordAuthor | 건축정보모델링 | - |
| dc.subject.keywordAuthor | 4차원 CAD | - |
| dc.subject.keywordAuthor | 간섭관리시스템 | - |
| dc.subject.keywordAuthor | 시공성 분석攀 * 연세대 건축공학과 대학원 석사과정 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
