Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation

Authors
Kang, Leen SeokKim, Hyeon SeungMoon, Hyoun SeokKim, Sung-Keun
Issue Date
Aug-2016
Publisher
ELSEVIER SCIENCE BV
Keywords
Telepresence; nD CAD; Webcam; BIM; Decision making
Citation
AUTOMATION IN CONSTRUCTION, v.68, pp 32 - 43
Pages
12
Indexed
SCIE
SCOPUS
Journal Title
AUTOMATION IN CONSTRUCTION
Volume
68
Start Page
32
End Page
43
URI
https://scholarworks.gnu.ac.kr/handle/sw.gnu/15348
DOI
10.1016/j.autcon.2016.04.003
ISSN
0926-5805
1872-7891
Abstract
In recent years, the increased utilization of building information modeling (BIM) has brought attention to the need for BIM-based operation systems that provide a decision-making feature in addition to visual information: This study constructed a project schedule management system that integrates the data points of an nD computer aided design (CAD) object (e.g., schedule and resource information) with a telepresence concept video management operation system. A methodology was developed that allows the user to monitor the current construction status relative to the design and verify the completion of the facility through real-time comparison between the planned process represented by the nD object and the actual image of the construction site sent from an on-site webcam. An active nD CAD system was developed that possesses features such as a comparative simulation between the on-site image and a 4D object to minimize interference between processes and a 5D object that is specialized to the resource mobilization level of the field. A telepresence-based nD CAD system was developed based on this methodology, and the practicality of the system was verified by webcams installed on a bridge construction site. Thus, the project manager is not only able to utilize the nD object for visualization but is also able to use the system as a decision-making system to formulate the most appropriate project schedule by comparing the nD object with the actual on-site image. (C) 2016 Elsevier B.V. All rights reserved.
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kang, Leen Seok photo

Kang, Leen Seok
공과대학 (토목공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE