Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation

Full metadata record
DC Field Value Language
dc.contributor.authorKang, Leen Seok-
dc.contributor.authorKim, Hyeon Seung-
dc.contributor.authorMoon, Hyoun Seok-
dc.contributor.authorKim, Sung-Keun-
dc.date.accessioned2022-12-26T20:04:29Z-
dc.date.available2022-12-26T20:04:29Z-
dc.date.issued2016-08-
dc.identifier.issn0926-5805-
dc.identifier.issn1872-7891-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/15348-
dc.description.abstractIn recent years, the increased utilization of building information modeling (BIM) has brought attention to the need for BIM-based operation systems that provide a decision-making feature in addition to visual information: This study constructed a project schedule management system that integrates the data points of an nD computer aided design (CAD) object (e.g., schedule and resource information) with a telepresence concept video management operation system. A methodology was developed that allows the user to monitor the current construction status relative to the design and verify the completion of the facility through real-time comparison between the planned process represented by the nD object and the actual image of the construction site sent from an on-site webcam. An active nD CAD system was developed that possesses features such as a comparative simulation between the on-site image and a 4D object to minimize interference between processes and a 5D object that is specialized to the resource mobilization level of the field. A telepresence-based nD CAD system was developed based on this methodology, and the practicality of the system was verified by webcams installed on a bridge construction site. Thus, the project manager is not only able to utilize the nD object for visualization but is also able to use the system as a decision-making system to formulate the most appropriate project schedule by comparing the nD object with the actual on-site image. (C) 2016 Elsevier B.V. All rights reserved.-
dc.format.extent12-
dc.language영어-
dc.language.isoENG-
dc.publisherELSEVIER SCIENCE BV-
dc.titleManaging construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation-
dc.typeArticle-
dc.publisher.location네델란드-
dc.identifier.doi10.1016/j.autcon.2016.04.003-
dc.identifier.scopusid2-s2.0-84964828598-
dc.identifier.wosid000379371100004-
dc.identifier.bibliographicCitationAUTOMATION IN CONSTRUCTION, v.68, pp 32 - 43-
dc.citation.titleAUTOMATION IN CONSTRUCTION-
dc.citation.volume68-
dc.citation.startPage32-
dc.citation.endPage43-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaConstruction & Building Technology-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryConstruction & Building Technology-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordPlus4D OBJECT-
dc.subject.keywordPlusSYSTEM-
dc.subject.keywordPlusINFORMATION-
dc.subject.keywordPlusPROJECTS-
dc.subject.keywordPlusPROGRESS-
dc.subject.keywordPlusWORKS-
dc.subject.keywordAuthorTelepresence-
dc.subject.keywordAuthornD CAD-
dc.subject.keywordAuthorWebcam-
dc.subject.keywordAuthorBIM-
dc.subject.keywordAuthorDecision making-
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE