Roadmap Configuration for Technical Elements Acquisition of Military Fixed Wing Aircraft Parts PHM and Verification of Parts Selection Phase
- Authors
- Kim, Geun-Yeong; Hwang, Jae-Ki; Im, Yeong-Ki; Ha, Seok-Wun
- Issue Date
- Sep-2019
- Publisher
- 한국항공우주학회
- Keywords
- PHM(Prognostics and Health Management); CBM+(ConditionBased Maintenance +); Reliability
- Citation
- Journal of The Korean Society Aeronautical and Space Sciences, v.47, no.9, pp 665 - 677
- Pages
- 13
- Indexed
- SCOPUS
ESCI
KCI
- Journal Title
- Journal of The Korean Society Aeronautical and Space Sciences
- Volume
- 47
- Number
- 9
- Start Page
- 665
- End Page
- 677
- URI
- https://scholarworks.gnu.ac.kr/handle/sw.gnu/74401
- DOI
- 10.5139/JKSAS.2019.47.9.665
- ISSN
- 1225-1348
2287-6871
- Abstract
- The United States has implemented the TLCSM (Total Life Cycle System Management) to minimize the total lifecycle cost of aircraft and to improve operating availability. As a practical strategy, CBM + is required to be applied to new weapons systems. The F-35 aircraft applied PHM under CBM + concept from the development stage. In this study, we analyzed the technology trends, the level of PHM technology in Korea, and the development trends of foreign technology. Then, we analyzed the PHM technical elements and constructed the 5 phases of technical elements acquisition roadmap for military fixed wing aircraft parts PHM.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - 공과대학 > Department of Aerospace and Software Engineering > Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.