Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

건설시설물 공정정보 시각화를 위한 4D CAD시스템 개발 및 적용사례 분석Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project

Other Titles
Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project
Authors
강인석윤선미권중희문진석
Issue Date
2007
Publisher
한국철도학회
Keywords
4D CAD System; WBS; Schedule Data; 3D Model; VR (Virtual Reality)4D CAD 시스템; 공통정보코드; 가상현실; 4D CAD 시스템; 공통정보코드; 가상현실
Citation
한국철도학회논문집, v.10, no.4, pp 373 - 380
Pages
8
Indexed
KCI
Journal Title
한국철도학회논문집
Volume
10
Number
4
Start Page
373
End Page
380
URI
https://scholarworks.gnu.ac.kr/handle/sw.gnu/28766
ISSN
1738-6225
2288-2235
Abstract
Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kang, Leen Seok photo

Kang, Leen Seok
공과대학 (토목공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE