건설시설물 공정정보 시각화를 위한 4D CAD시스템 개발 및 적용사례 분석Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project
- Other Titles
- Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project
- Authors
- 강인석; 윤선미; 권중희; 문진석
- Issue Date
- 2007
- Publisher
- 한국철도학회
- Keywords
- 4D CAD System; WBS; Schedule Data; 3D Model; VR (Virtual Reality)4D CAD 시스템; 공통정보코드; 가상현실; 4D CAD 시스템; 공통정보코드; 가상현실
- Citation
- 한국철도학회논문집, v.10, no.4, pp 373 - 380
- Pages
- 8
- Indexed
- KCI
- Journal Title
- 한국철도학회논문집
- Volume
- 10
- Number
- 4
- Start Page
- 373
- End Page
- 380
- URI
- https://scholarworks.gnu.ac.kr/handle/sw.gnu/28766
- ISSN
- 1738-6225
2288-2235
- Abstract
- Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - 공과대학 > Department of Civil Engineering > Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.