Cited 0 time in
건설시설물 공정정보 시각화를 위한 4D CAD시스템 개발 및 적용사례 분석
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 강인석 | - |
| dc.contributor.author | 윤선미 | - |
| dc.contributor.author | 권중희 | - |
| dc.contributor.author | 문진석 | - |
| dc.date.accessioned | 2022-12-27T07:18:43Z | - |
| dc.date.available | 2022-12-27T07:18:43Z | - |
| dc.date.issued | 2007 | - |
| dc.identifier.issn | 1738-6225 | - |
| dc.identifier.issn | 2288-2235 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/28766 | - |
| dc.description.abstract | Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches. | - |
| dc.format.extent | 8 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국철도학회 | - |
| dc.title | 건설시설물 공정정보 시각화를 위한 4D CAD시스템 개발 및 적용사례 분석 | - |
| dc.title.alternative | Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 한국철도학회논문집, v.10, no.4, pp 373 - 380 | - |
| dc.citation.title | 한국철도학회논문집 | - |
| dc.citation.volume | 10 | - |
| dc.citation.number | 4 | - |
| dc.citation.startPage | 373 | - |
| dc.citation.endPage | 380 | - |
| dc.identifier.kciid | ART001076563 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | 4D CAD System | - |
| dc.subject.keywordAuthor | WBS | - |
| dc.subject.keywordAuthor | Schedule Data | - |
| dc.subject.keywordAuthor | 3D Model | - |
| dc.subject.keywordAuthor | VR (Virtual Reality)4D CAD 시스템 | - |
| dc.subject.keywordAuthor | 공통정보코드 | - |
| dc.subject.keywordAuthor | 가상현실 | - |
| dc.subject.keywordAuthor | 4D CAD 시스템 | - |
| dc.subject.keywordAuthor | 공통정보코드 | - |
| dc.subject.keywordAuthor | 가상현실 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
