Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Study on Standardization Methods for Reducing Revision Rate of Hull Production Design

Full metadata record
DC Field Value Language
dc.contributor.author안태현-
dc.contributor.author이탁기-
dc.date.accessioned2022-12-26T09:20:46Z-
dc.date.available2022-12-26T09:20:46Z-
dc.date.issued2022-
dc.identifier.issn1225-0767-
dc.identifier.issn2287-6715-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/2377-
dc.description.abstractStructural design for shipbuilding is generally divided into three stages: the basic, detailed, and production designs, of which the production design is the most frequently revised among the three design stages. The revision involved in production design department was approximately 61% of the total 4,211 revision members and approximately 56% of the total 710 revision cases in the survey on the number of design revisions for nine ships. In this study, members and drawings with a high revision rate were investigated, and related design departments were identified. In addition, the work contents of the design department were analyzed to reduce the number of design revisions and three tasks are very frequently revised were selected. A survey was conducted with engineers engaged in the production design, after which, standards were proposed for the method of aggregating bills of materials, to employ macros to calculate the length of members and that of profile input data when reviewing drawings. Via the study, it was determined that the major causes of design revision are simple mistakes by engineers or lack of understanding on structural arrangement of basic members more than intricacies of prior design and high level specification. As a result of applying the proposed standards, it was confirmed that the design revision was reduced by approximately 40%.-
dc.format.extent7-
dc.language영어-
dc.language.isoENG-
dc.publisher한국해양공학회-
dc.titleStudy on Standardization Methods for Reducing Revision Rate of Hull Production Design-
dc.title.alternativeStudy on Standardization Methods for Reducing Revision Rate of Hull Production Design-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.bibliographicCitation한국해양공학회지, v.36, no.2, pp 125 - 131-
dc.citation.title한국해양공학회지-
dc.citation.volume36-
dc.citation.number2-
dc.citation.startPage125-
dc.citation.endPage131-
dc.identifier.kciidART002834889-
dc.description.isOpenAccessY-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorHulll production design-
dc.subject.keywordAuthorRevision rate-
dc.subject.keywordAuthorBill of material-
dc.subject.keywordAuthorCheck for member length-
dc.subject.keywordAuthorAssembly process-
Files in This Item
There are no files associated with this item.
Appears in
Collections
해양과학대학 > 조선해양공학과 > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Tak Kee photo

Lee, Tak Kee
해양과학대학 (조선해양공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE