상세 보기
철골세우기 작업의 영향요인별 현장생산성 측정 및 분석
- 허영기;
- 이지용;
- 윤석헌;
- 태용호;
- 안방률
초록
In today's construction industry, buildings have been more complicated and higher, the demands of steel works have been increasingly concerned, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work; one tower crane operated work and two tower crane operated; and work productivity conducted in clear weather condition, cloud and rainy. However, the productivities of ‘first node on ground’ and ‘second node on ground’ were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.
키워드
- 제목
- 철골세우기 작업의 영향요인별 현장생산성 측정 및 분석
- 제목 (타언어)
- Productivity Measurement and Analysis on Factors in Steel Erection
- 저자
- 허영기; 이지용; 윤석헌; 태용호; 안방률
- 발행일
- 2009
- 저널명
- 한국건축시공학회지
- 권
- 9
- 호
- 2
- 페이지
- 31 ~ 38
- 언어
- KOR
- 출판사
- 한국건축시공학회
- 발행국가
- 대한민국
- 분량
- 8 페이지
- ISSN
- E 2233-5706
P 1598-2033