DGCNN을 사용한 건설 모니터링의 진척도 정확성 개선

Improving the Accuracy of Construction Monitoring Using DGCNN
  • 이주형
  • 정상윤
  • 이재희
  • 강인석

초록

Due to the inefficiency of traditional methods, construction monitoring using smart equipment and BIM is gradually increasing due to the need for accurate progress measurement and automatic management. However, there are problems with complex integration and accuracy of element classification using PCD due to the difference in formats used to classify BIM and PCD. Therefore, the purpose of this study is to suggest a method to easily identify the progress by comparing PCD and PCD, increase the accuracy of element classification, and improve construction monitoring. In this study, PCD was created while maintaining model information using IFC and GUID in the design model, and the progress was identified by comparing it with the PCD obtained on site. In addition, for verification, classification was performed according to the schedule and verification was performed using the DGCNN algorithm. Through this, problems of complexity and accuracy are improved, and monitoring using more accurate information is possible by utilizing the obtained information.

키워드

BIM 모델PCDDGCNN 알고리즘요소 분류BIM ModelPCDDGCNN AlgorithmElement Classification
제목
DGCNN을 사용한 건설 모니터링의 진척도 정확성 개선
제목 (타언어)
Improving the Accuracy of Construction Monitoring Using DGCNN
저자
이주형정상윤이재희강인석
DOI
10.13161/kibim.2025.15.1.001
발행일
2025-03
저널명
KIBIM Magazine
15
1
페이지
001 ~ 012