OPTIMAL MAINTENANCE SCHEDULING FOR A SYSTEM WITH INDIRECT AND DIRECT PREVENTIVE MAINTENANCE

Citations

WEB OF SCIENCE

2
Citations

SCOPUS

2

초록

This paper investigates an optimal maintenance scheduling for a repairable system which is periodically maintained by two types of preventive maintenance (PM) activities; indirect PM and direct PM. The indirect PM is a passive and short-term PM activity reducing the stress of the operating environment, and the direct PM is an active and long-term PM activity prolonging the lifetime of system. In our proposed PM model, imperfect PMs are assumed and the system is minimally repaired at failures between PMs. The imperfect PM is formulated using the improvement factor which represents the degree of improvement by PM. A scheduling is defined to be optimum if it minimizes the expected cost rate comprised of the indirect PM cost, direct PM cost, repair cost and replacement cost. An application example is given to illustrate the implementation of the scheduling and investigations for various choices of maintenance variables are performed to provide insights for an effect of the variables and inter-relationship of them Significance: This paper investigates modeling and analysis for a system which employs two types PM; direct and indirect PMs, and provides insights for an effect of two PMs and inter-relationship of them.

키워드

Direct PMIndirect PMMaintenance policyMaintenance schedulingPreventive maintenanceIMPERFECT MAINTENANCEPOLICIESOPTIMIZATIONINTENSITYALGORITHMREPAIR
제목
OPTIMAL MAINTENANCE SCHEDULING FOR A SYSTEM WITH INDIRECT AND DIRECT PREVENTIVE MAINTENANCE
저자
Park, J. H.Lee, S. C.Lee, S.Lie, C. H.
발행일
2011
유형
Article
저널명
International Journal of Industrial Engineering : Theory Applications and Practice
18
7
페이지
335 ~ 343