상세 보기
가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구
- 박창욱;
- 문승윤;
- 윤석헌
초록
The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.
키워드
- 제목
- 가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구
- 제목 (타언어)
- A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area
- 저자
- 박창욱; 문승윤; 윤석헌
- 발행일
- 2008
- 저널명
- 한국건축시공학회지
- 권
- 8
- 호
- 4
- 페이지
- 61 ~ 69
- 언어
- KOR
- 출판사
- 한국건축시공학회
- 발행국가
- 대한민국
- 분량
- 9 페이지
- ISSN
- E 2233-5706
P 1598-2033