Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

초록

In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS’s cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

키워드

FormStructural WorkGuide-rail SystemAuto-climbing SystemSimulation
제목
Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project
제목 (타언어)
Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project
저자
윤석헌김상철
발행일
2012
저널명
Architectural Research
14
3
페이지
109 ~ 116