4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구
- 전승호;
- 백준홍;
- 윤석헌
초록
Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) as 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.
키워드
- 제목
- 4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구
- 제목 (타언어)
- A Study on 4D CAD and GIS Integrated System for Process Risk Management Model
- 저자
- 전승호; 백준홍; 윤석헌
- 발행일
- 2007
- 저널명
- 한국건축시공학회지
- 권
- 7
- 호
- 3
- 페이지
- 91 ~ 98
- 출판사
- 한국건축시공학회
- 발행국가
- 대한민국
- 분량
- 8 페이지
- ISSN
- E 2233-5706
P 1598-2033