The optimal method for imputing missing data in the preprocessing phase to enhance the performance of a DNN-based construction period prediction model

Citations

SCOPUS

1

초록

The success of construction projects is influenced by various factors, with accurate management and prediction of the construction period playing a crucial role. The construction period is determined through contracts between the client and the contractor, and it is considered a key element in the management of construction projects, alongside cost management. To ensure the successful completion of projects, accurate prediction of the construction period is essential, as it aids in the efficient allocation of time and resources. The main objective of this study is to maximize the performance of construction period prediction models by applying and comparing various methods for handling missing data. Optimizing the model's performance requires accuracy and completeness of data, with the process of outlier removal and missing data imputation potentially having a significant impact on the model's predictive capability. During this process, the effect of changes in the dataset on model performance will be closely examined to identify the most effective method for handling missing data. Outlier removal and missing data imputation are crucial steps in the data preprocessing phase, and they can significantly improve the model's accuracy and reliability. This research aims to apply these data preprocessing methods and analyze their outcomes to find the most effective missing data imputation method for construction period prediction. After the selection process, considering the model's performance and stability, the mode imputation method was identified as the most suitable for predicting the construction period. The findings of this research are expected to contribute not only to improving the accuracy of construction period predictions but also to enhancing the overall efficiency and success rate of construction project management. © 2024, Korea Institute of Construction Engineering and Management. All rights reserved.

키워드

construction period; imputation methods; machine learning; missing data
제목
The optimal method for imputing missing data in the preprocessing phase to enhance the performance of a DNN-based construction period prediction model
저자
Lee, Haneul; Yun, Yeongchae; Kim, Youkyung; Yun, Seokheon
DOI
10.6106/ICCEPM.2024.0271
발행일
2024-07
유형
Conference paper
저널명
International Conference on Construction Engineering and Project Management
페이지
271 ~ 276