GUI of GMS Simulation Tool Using Fuzzy Methods

  • Lee, Yeonchan
  • Choi, Jaeseok
  • Jung, Myeunghoon
  • Watada, Junzo
Citations

WEB OF SCIENCE

0
Citations

SCOPUS

0

초록

This study used the fuzzy theory for creating preventive maintenance scheduling of generator (GMS). GMS simulation tool is developed in optimum by the CO2 emission, probabilistic production cost, and reliability criteria LOLE (Loss of load expectation), EENS(Expected energy not served) in the objective functions. GMS has shown in graphical user interface (GUI) for the user-friendliness of the generator. It can be resulted in generator maintenance scheduling, reliability indices of power system, total probabilistic production costs and each power company probabilistic production costs.

키워드

Simulation toolsFuzzy methodsGenerator maintenance scheduling
제목
GUI of GMS Simulation Tool Using Fuzzy Methods
저자
Lee, YeonchanChoi, JaeseokJung, MyeunghoonWatada, Junzo
DOI
10.1007/978-3-319-63859-1_42
발행일
2018
유형
Proceedings Paper
저널명
Smart Innovation, Systems and Technologies
82
페이지
343 ~ 351