BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안

Improvement of BoQ Documents for the BIM based Quantity Takeoff

초록

It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

키워드

개산견적BIM내역서Preliminary Cost EstimationBuilding information modelingBill of Quantity
제목
BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안
제목 (타언어)
Improvement of BoQ Documents for the BIM based Quantity Takeoff
저자
안지원윤석헌
발행일
2017
저널명
KIBIM Magazine
7
2
페이지
16 ~ 24