Linear 4D system using schedule-location charts for infrastructure projects
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, Jae Hee | - |
dc.contributor.author | Park, Sang Mi | - |
dc.contributor.author | Kim, Sung Keun | - |
dc.contributor.author | Kang, Leen Seok | - |
dc.date.accessioned | 2022-12-26T05:41:18Z | - |
dc.date.available | 2022-12-26T05:41:18Z | - |
dc.date.issued | 2022-09 | - |
dc.identifier.issn | 0926-5805 | - |
dc.identifier.issn | 1872-7891 | - |
dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/918 | - |
dc.description.abstract | Since the traditional 4D system is a one-axis simulation method centered on the construction schedule, it is difficult to express detailed location information of the activity. In order to solve this problem, it is necessary to configure a 4D system with a two-axis simulation method that simultaneously expresses schedule and location information of each activity. This study attempts to develop a method of constructing a ScheLo chart that expresses both schedule and location and a linear 4D system (Linear4D) directly linked to the ScheLo chart. In the Linear4D, activities can be simulated simultaneously in a specific period and location, and its practicality is verified by an actual project. In projects where activities are performed in a linear space spanning several tens of kilometers, such as roads and railroads, the activities are managed with horizontal location information, so the Linear4D can be used to expand 4D system research for infrastructure projects. | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | Elsevier BV | - |
dc.title | Linear 4D system using schedule-location charts for infrastructure projects | - |
dc.type | Article | - |
dc.publisher.location | 네델란드 | - |
dc.identifier.doi | 10.1016/j.autcon.2022.104413 | - |
dc.identifier.scopusid | 2-s2.0-85132219949 | - |
dc.identifier.wosid | 000812838900002 | - |
dc.identifier.bibliographicCitation | Automation in Construction, v.141 | - |
dc.citation.title | Automation in Construction | - |
dc.citation.volume | 141 | - |
dc.type.docType | Article | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Construction & Building Technology | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.subject.keywordPlus | CONSTRUCTION | - |
dc.subject.keywordPlus | CAD | - |
dc.subject.keywordAuthor | Linear4D (linear 4D system) | - |
dc.subject.keywordAuthor | ScheLo chart (schedule-location chart) | - |
dc.subject.keywordAuthor | Gantt chart | - |
dc.subject.keywordAuthor | Infrastructure project | - |
dc.subject.keywordAuthor | Location information | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0533
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.