Cited 0 time in
Development of operational algorithm of bess linked with renewable energy complex in terms of power system reliability
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Oh, U. | - |
| dc.contributor.author | Lee, Y. | - |
| dc.contributor.author | Lim, J.-T. | - |
| dc.contributor.author | Choi, J. | - |
| dc.date.accessioned | 2022-12-26T14:02:00Z | - |
| dc.date.available | 2022-12-26T14:02:00Z | - |
| dc.date.issued | 2020 | - |
| dc.identifier.issn | 1975-8359 | - |
| dc.identifier.issn | 2287-4364 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/8124 | - |
| dc.description.abstract | This paper proposes a probabilistic reliability evaluation model and algorithm for the power system considering wind turbine generator (WTG) and battery energy storage system (BESS) in viewpoint of power system reliability. A large-scale wind turbine generator (WTG) can creates significant power fluctuations and should affect the stability, frequency control and then reliability of the power system. Therefore, wind power should be limited to supply the percentage of load. The output of WTG cannot be predicted accurately and so results in significant fluctuations in power supply balance. Therefore, it is difficult to control the power balance between supply and demand. However, it can be controlled by installing the BESS. The BESS may smooth the fluctuation of the WTG power output. This paper proposes reliability based alternative algorithm in order to simulate the effects of the interaction of multiple WTG and BESS newly. Additionally, this paper presents sample system studies that single BESS as well as multi-BESS are simulated by handwork very clearly. Futhermore, the reliability effects of BESS according to a couple of different BESS operation rules and conditions are demonstrated in sample system case study. Copyright ? The Korean Institute of Electrical Engineers. | - |
| dc.format.extent | 11 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | Korean Institute of Electrical Engineers | - |
| dc.title | Development of operational algorithm of bess linked with renewable energy complex in terms of power system reliability | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.5370/KIEE.2020.69.1.16 | - |
| dc.identifier.scopusid | 2-s2.0-85081985545 | - |
| dc.identifier.bibliographicCitation | Transactions of the Korean Institute of Electrical Engineers, v.69, no.1, pp 16 - 26 | - |
| dc.citation.title | Transactions of the Korean Institute of Electrical Engineers | - |
| dc.citation.volume | 69 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 16 | - |
| dc.citation.endPage | 26 | - |
| dc.type.docType | Article | - |
| dc.identifier.kciid | ART002547477 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Battery Energy Storage System (BESS) | - |
| dc.subject.keywordAuthor | Reliability Evaluation | - |
| dc.subject.keywordAuthor | Wind Turbine Generator (WTG) | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
