Real-time Synchronization of Activity Simulation Based on Construction Duration Proportionality

Full metadata record
DC Field Value Language
dc.contributor.author이재희-
dc.contributor.author강인석-
dc.date.accessioned2025-05-07T05:00:17Z-
dc.date.available2025-05-07T05:00:17Z-
dc.date.issued2025-03-
dc.identifier.issn2093-8829-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/78013-
dc.description.abstractIn a 4D CAD system, the 3D representation of the completeness of each activity is usually expressed based on a specific date, such as the finish date of the activity, with the activity described in only two forms: completed or uncompleted. In such a representation, the completion of the activity is not visible at the beginning of the construction period, and the entire completion is displayed at once at the finish time. In other words, there is a gap between the completion status of the simulated activity according to the planned construction period and the completion status according to the actual construction period. In particular, the representation of vertically high structures such as bridge piers and horizontally long structures such as tunnels and earthworks is more different from the actual progress status. To address these issues, this study develops a methodology based on the morphing technique, which proportionally simulates the completed state of an activity over the construction progress. The methodology is then implemented to verify its applicability in real-world projects. To this end, the central axis of the axial direction for each 3D model is determined. A methodology and corresponding function are then developed to simulate completion along the central axis in proportion to the construction progress. In this way, the completion of the activity is expressed proportionally by date according to the construction period, so the activities with a long construction period can be simulated similarly to the actual progress of the activity by date on the construction site.-
dc.format.extent14-
dc.language영어-
dc.language.isoENG-
dc.publisher한국토지주택공사 토지주택연구원-
dc.titleReal-time Synchronization of Activity Simulation Based on Construction Duration Proportionality-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.doi10.5804/LHR.2025.16.1.197-
dc.identifier.bibliographicCitationLHI Journal of Land, Housing, and Urban Affairs, v.16, no.1, pp 197 - 210-
dc.citation.titleLHI Journal of Land, Housing, and Urban Affairs-
dc.citation.volume16-
dc.citation.number1-
dc.citation.startPage197-
dc.citation.endPage210-
dc.identifier.kciidART003191356-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthor4D CAD-
dc.subject.keywordAuthorActivity Simulation-
dc.subject.keywordAuthorMorphing-
dc.subject.keywordAuthorConstruction Duration Proportionality-
Files in This Item
There are no files associated with this item.
Appears in
Collections
공학계열 > 토목공학과 > Journal Articles
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kang, Leen Seok photo

Kang, Leen Seok
공과대학 (토목공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE