BIM모델 속성정보를 활용한 상세설계단계에서의 철근 수량산출 자동화 방안 - 기둥 철근 수량산출 중심으로 -Automation of Rebar Quantity Estimation in the Detailed Design Stage Using BIM Model Properties - Focused on the Calculation of Column Reinforcement Quantity -

Other Titles
Automation of Rebar Quantity Estimation in the Detailed Design Stage Using BIM Model Properties - Focused on the Calculation of Column Reinforcement Quantity -
Authors
이하늘윤석헌
Issue Date
Sep-2024
Publisher
한국BIM학회
Keywords
Rebar; BIM; Quantity Estimation; Detailed Design; 철근; 건물정보모델; 물량산출; 상세설계
Citation
KIBIM Magazine, v.14, no.3, pp 13 - 21
Pages
9
Indexed
KCI
Journal Title
KIBIM Magazine
Volume
14
Number
3
Start Page
13
End Page
21
URI
https://scholarworks.gnu.ac.kr/handle/sw.gnu/74245
DOI
10.13161/kibim.2024.14.3.013
ISSN
2288-1697
Abstract
This study aims to simplify the rebar quantity estimation process during the detailed design stage of buildings by addressing identified issues in the existing rebar quantity estimation process and establishing a BIM-based simplification method. To validate the applicability of the proposed method, it was applied to a case study of 'K' High School, with the results compared to rebar quantities from shop drawings to assess usability in real projects. It showed an error rate of 1.4% for SHD22S and 2.63% for HD10 among the types of rebar used in the case model. SHD22S, used as the main rebar in the columns, exhibited this error due to differences in the calculation method for splice and anchorage lengths. HD10, used as stirrup rebar in the columns, showed errors due to the omission of hook length considerations in the simplified estimation formula. Although these discrepancies resulted in cumulative errors of 10 to 20 meters, the error rates of 1.4% and 2.63% respectively fall within the generally accepted rebar overage rate of 5%, suggesting that this method is sufficiently accurate for quantity estimation during the detailed design stage. This study presents a method for efficiently estimating rebar quantities based on BIM during the detailed design stage. While traditional 2D quantity estimation and BIM-based methods often suffer from inefficiencies due to repetitive tasks and high modeling complexity, the proposed method assumes BIM models at LOD200, which are less complex and automate most of the structural information required for rebar quantity estimation, thereby reducing repetitive tasks. However, to further minimize errors, especially those related to hook and anchorage length calculations, additional research is needed to refine the estimation process and expand its applicability to the entire building's rebar quantity estimation.
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > School of Architectural Engineering > Journal Articles
공학계열 > 건축공학과 > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Yun, Seok Heon photo

Yun, Seok Heon
공과대학 (건축공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE