Integrated Design Process for Modular Construction Projects to Reduce Rework
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 이정훈 | - |
dc.contributor.author | 박문서 | - |
dc.contributor.author | 이현수 | - |
dc.contributor.author | 현호상 | - |
dc.contributor.author | 김현수 | - |
dc.date.accessioned | 2022-12-26T13:03:42Z | - |
dc.date.available | 2022-12-26T13:03:42Z | - |
dc.date.issued | 2020-01 | - |
dc.identifier.issn | 2071-1050 | - |
dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/7039 | - |
dc.description.abstract | In modular construction projects, unit production and onsite work are conducted concurrently, enabling shorter duration, lower cost, and improved quality. Because of the nature of the work, building design details should be determined early in the design phase, which requires information from participants. However, the design process for stick-built construction does not include such information, which leads to errors in design, such as omissions and conflicts of information from participants, causing reworking in the design phase. To reduce errors, an information flow should be identified representing when/what/how the information should be shared, and with whom. This paper proposes an integrated design process based on the information flow. To identify the flow, a precedence relationship between activities is represented using a dependency structure matrix (DSM). Then, the order of activities is rearranged using a partitioning algorithm. In this manner, unnecessary feedback and reverse information flow, which are related to errors, are reduced. Finally, the rearranged activities are proposed as an integrated design process. To validate the impact of the proposed process and methodology, interviews with experts were conducted. The validation results suggest that the project delivery method should also be considered in the early project phase in practical application. | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | MDPI | - |
dc.title | Integrated Design Process for Modular Construction Projects to Reduce Rework | - |
dc.type | Article | - |
dc.publisher.location | 스위스 | - |
dc.identifier.bibliographicCitation | sustainability | - |
dc.citation.title | sustainability | - |
dc.description.isOpenAccess | Y | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | ssci | - |
dc.description.journalRegisteredClass | scopus | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0533
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.