독립변수와 종속변수 정규화를 통한 총 공사기간 예측성능 분석
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Kang, Yun-Ho | - |
| dc.contributor.author | Lee, Ha-Neaul | - |
| dc.contributor.author | Yun, Seok-Heon | - |
| dc.date.accessioned | 2024-02-20T09:00:18Z | - |
| dc.date.available | 2024-02-20T09:00:18Z | - |
| dc.date.issued | 2023-11 | - |
| dc.identifier.issn | 2733-6239 | - |
| dc.identifier.issn | 2733-6247 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/69687 | - |
| dc.description.abstract | The estimation of the appropriate construction period in the construction project is one of the main factors for successfully completing the project. Various artificial intelligence technologies have been developed and various efforts have been made to improve prediction performance during the construction period by applying them, but it is still difficult to accurately predict the construction period. It is judged that the predictive performance of the learning data during the construction period may be poor due to the large deviation of the data between the independent variable and the dependent variable. In this study, it was intended to improve the predictive performance of the construction period by reducing the data deviation through the normalization of the dependent and independent variables of the training data. In this study, a total of 953 data from by the PPS(Public Procurement Service) in Korea were used for five years from 2017 to 2022, and to reduce the relative difference between independent and dependent variable data, three models were defined, and the training results were compared and analyzed. As a result of the analysis, it is judged that the model using Log normalization has the best prediction performance. © 2023, Architectural Institute of Korea. All rights reserved. | - |
| dc.format.extent | 7 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | Architectural Institute of Korea | - |
| dc.title | 독립변수와 종속변수 정규화를 통한 총 공사기간 예측성능 분석 | - |
| dc.title.alternative | Prediction Performance Analysis of Total Construction Period through Normalization of Independent and Dependent Variables | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.5659/JAIK.2023.39.11.281 | - |
| dc.identifier.scopusid | 2-s2.0-85184389674 | - |
| dc.identifier.bibliographicCitation | Journal of the Architectural Institute of Korea, v.39, no.11, pp 281 - 287 | - |
| dc.citation.title | Journal of the Architectural Institute of Korea | - |
| dc.citation.volume | 39 | - |
| dc.citation.number | 11 | - |
| dc.citation.startPage | 281 | - |
| dc.citation.endPage | 287 | - |
| dc.type.docType | Article | - |
| dc.identifier.kciid | ART003017195 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Construction Period | - |
| dc.subject.keywordAuthor | Log | - |
| dc.subject.keywordAuthor | Machine Learning | - |
| dc.subject.keywordAuthor | Normalization | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.