Cited 0 time in
군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 박준호 | - |
| dc.contributor.author | 송지훈 | - |
| dc.date.accessioned | 2023-11-13T07:43:29Z | - |
| dc.date.available | 2023-11-13T07:43:29Z | - |
| dc.date.issued | 2023-10 | - |
| dc.identifier.issn | 1226-833x | - |
| dc.identifier.issn | 2765-5415 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/68475 | - |
| dc.description.abstract | With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost. | - |
| dc.format.extent | 12 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국산업융합학회 | - |
| dc.title | 군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구 | - |
| dc.title.alternative | Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 한국산업융합학회논문집, v.26, no.5, pp 855 - 866 | - |
| dc.citation.title | 한국산업융합학회논문집 | - |
| dc.citation.volume | 26 | - |
| dc.citation.number | 5 | - |
| dc.citation.startPage | 855 | - |
| dc.citation.endPage | 866 | - |
| dc.identifier.kciid | ART003010151 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Performance Based Logistics | - |
| dc.subject.keywordAuthor | RAM-C | - |
| dc.subject.keywordAuthor | Reliability | - |
| dc.subject.keywordAuthor | Availability | - |
| dc.subject.keywordAuthor | Maintainability | - |
| dc.subject.keywordAuthor | Cost Analysis | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
