공동주택의 공기지연 원인분석 사례 연구
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 박창욱 | - |
| dc.contributor.author | 윤석헌 | - |
| dc.date.accessioned | 2022-12-27T05:49:36Z | - |
| dc.date.available | 2022-12-27T05:49:36Z | - |
| dc.date.issued | 2009 | - |
| dc.identifier.issn | 1598-2033 | - |
| dc.identifier.issn | 2233-5706 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/26993 | - |
| dc.description.abstract | A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site. | - |
| dc.format.extent | 6 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국건축시공학회 | - |
| dc.title | 공동주택의 공기지연 원인분석 사례 연구 | - |
| dc.title.alternative | A Case Study on Reason Analysis for Schedule Delay of Apartment House | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 한국건축시공학회지, v.9, no.1, pp 89 - 94 | - |
| dc.citation.title | 한국건축시공학회지 | - |
| dc.citation.volume | 9 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 89 | - |
| dc.citation.endPage | 94 | - |
| dc.identifier.kciid | ART001317104 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kciCandi | - |
| dc.subject.keywordAuthor | 공정관리 | - |
| dc.subject.keywordAuthor | 지연일수 | - |
| dc.subject.keywordAuthor | 중요도 | - |
| dc.subject.keywordAuthor | 공기지연 | - |
| dc.subject.keywordAuthor | Process control | - |
| dc.subject.keywordAuthor | Delay days | - |
| dc.subject.keywordAuthor | Importance | - |
| dc.subject.keywordAuthor | Schedule delay | - |
| dc.subject.keywordAuthor | Process control | - |
| dc.subject.keywordAuthor | Delay days | - |
| dc.subject.keywordAuthor | Importance | - |
| dc.subject.keywordAuthor | Schedule delay | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.