Cited 0 time in
철골세우기 작업의 영향요인별 현장생산성 측정 및 분석
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 허영기 | - |
| dc.contributor.author | 이지용 | - |
| dc.contributor.author | 윤석헌 | - |
| dc.contributor.author | 태용호 | - |
| dc.contributor.author | 안방률 | - |
| dc.date.accessioned | 2022-12-27T05:46:56Z | - |
| dc.date.available | 2022-12-27T05:46:56Z | - |
| dc.date.issued | 2009 | - |
| dc.identifier.issn | 1598-2033 | - |
| dc.identifier.issn | 2233-5706 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/26901 | - |
| dc.description.abstract | In today's construction industry, buildings have been more complicated and higher, the demands of steel works have been increasingly concerned, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work; one tower crane operated work and two tower crane operated; and work productivity conducted in clear weather condition, cloud and rainy. However, the productivities of ‘first node on ground’ and ‘second node on ground’ were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies. | - |
| dc.format.extent | 8 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국건축시공학회 | - |
| dc.title | 철골세우기 작업의 영향요인별 현장생산성 측정 및 분석 | - |
| dc.title.alternative | Productivity Measurement and Analysis on Factors in Steel Erection | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 한국건축시공학회지, v.9, no.2, pp 31 - 38 | - |
| dc.citation.title | 한국건축시공학회지 | - |
| dc.citation.volume | 9 | - |
| dc.citation.number | 2 | - |
| dc.citation.startPage | 31 | - |
| dc.citation.endPage | 38 | - |
| dc.identifier.kciid | ART001336011 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kciCandi | - |
| dc.subject.keywordAuthor | Steel Erection | - |
| dc.subject.keywordAuthor | Steel Construction | - |
| dc.subject.keywordAuthor | Productivity | - |
| dc.subject.keywordAuthor | Productive Factor | - |
| dc.subject.keywordAuthor | Steel Erection | - |
| dc.subject.keywordAuthor | Steel Construction | - |
| dc.subject.keywordAuthor | Productivity | - |
| dc.subject.keywordAuthor | Productive Factor | - |
| dc.subject.keywordAuthor | 철골세우기 | - |
| dc.subject.keywordAuthor | 철골공사 | - |
| dc.subject.keywordAuthor | 생산성 | - |
| dc.subject.keywordAuthor | 생산성 영향요인 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
