퍼지 이론을 통한 위험 가중치 적용 공기산정 모델 구축에 관한 연구
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 조성 | - |
| dc.contributor.author | 조용 | - |
| dc.contributor.author | 방광수 | - |
| dc.contributor.author | 윤석헌 | - |
| dc.contributor.author | 백준홍 | - |
| dc.date.accessioned | 2022-12-27T05:37:30Z | - |
| dc.date.available | 2022-12-27T05:37:30Z | - |
| dc.date.issued | 2009 | - |
| dc.identifier.issn | 1226-9107 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/26794 | - |
| dc.description.abstract | The purpose of this study is to propose Risk Weight model based on Fuzzy Logic in Decisive Risk Factor during Estimating Construction Period. this study introduce efficient estimating construction period model by applying risk factors to existing construction duration models. Risk factor, however, is unpredictable, so this study applies 퍼지 logic to efficiently predict risk factors. By using Fuzzy logic, risk factors can be quantified, and it is the difference between this study and existing construction duration models. According to having referenced idea as describe above, this paper will be studied by this process. First, trends of estimating construction period is researched and the present condition of them in steps of Fuzzy logic is researched. Second, decisive risk factor and appropriate construction period are derived. Third, Estimating Construction Period Model is proposed by Fuzzy logic. Fourth, Result based on Fuzzy logic is compared with former case. | - |
| dc.format.extent | 10 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 대한건축학회 | - |
| dc.title | 퍼지 이론을 통한 위험 가중치 적용 공기산정 모델 구축에 관한 연구 | - |
| dc.title.alternative | A Study on Estimating Construction Period Model based on Fuzzy Logic - Focused on Risk Weight in Project - | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.bibliographicCitation | 대한건축학회논문집 구조계, v.25, no.07, pp 103 - 112 | - |
| dc.citation.title | 대한건축학회논문집 구조계 | - |
| dc.citation.volume | 25 | - |
| dc.citation.number | 07 | - |
| dc.citation.startPage | 103 | - |
| dc.citation.endPage | 112 | - |
| dc.identifier.kciid | ART001366546 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Fuzzy Logic | - |
| dc.subject.keywordAuthor | Risk Weight | - |
| dc.subject.keywordAuthor | Estimating Construction Period | - |
| dc.subject.keywordAuthor | Decisive Risk Factor | - |
| dc.subject.keywordAuthor | 퍼지 이론 | - |
| dc.subject.keywordAuthor | 위험 가중치 | - |
| dc.subject.keywordAuthor | 공기산정 | - |
| dc.subject.keywordAuthor | 결정적 위험요인 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.