Cited 10 time in
Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Park, Jeongje | - |
| dc.contributor.author | Choi, Jaeseok | - |
| dc.contributor.author | Baek, Ungki | - |
| dc.contributor.author | Cha, Junmin | - |
| dc.contributor.author | Lee, Kwang Y. | - |
| dc.date.accessioned | 2022-12-27T04:19:26Z | - |
| dc.date.available | 2022-12-27T04:19:26Z | - |
| dc.date.issued | 2010-03 | - |
| dc.identifier.issn | 1975-0102 | - |
| dc.identifier.issn | 2093-7423 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/25185 | - |
| dc.description.abstract | A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010. | - |
| dc.format.extent | 8 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | KOREAN INST ELECTR ENG | - |
| dc.title | Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.5370/JEET.2010.5.1.008 | - |
| dc.identifier.scopusid | 2-s2.0-77949415614 | - |
| dc.identifier.wosid | 000275103300002 | - |
| dc.identifier.bibliographicCitation | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, v.5, no.1, pp 8 - 15 | - |
| dc.citation.title | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY | - |
| dc.citation.volume | 5 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 8 | - |
| dc.citation.endPage | 15 | - |
| dc.type.docType | Article | - |
| dc.identifier.kciid | ART001421232 | - |
| dc.description.isOpenAccess | Y | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Electrical & Electronic | - |
| dc.subject.keywordAuthor | Generator maintenance scheduling | - |
| dc.subject.keywordAuthor | Fuzzy set theory | - |
| dc.subject.keywordAuthor | Fuzzy multi-criteria functions | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
