Improved link system between schedule data and 3D object in 4D CAD system by using WBS code

Full metadata record
DC Field Value Language
dc.contributor.authorKang, Leen-Seok-
dc.contributor.authorMoon, Hyoun-Seok-
dc.contributor.authorPark, Seo-Young-
dc.contributor.authorKim, Chang-Hak-
dc.contributor.authorLee, Tai Sik-
dc.date.accessioned2022-12-27T04:04:20Z-
dc.date.available2022-12-27T04:04:20Z-
dc.date.issued2010-11-
dc.identifier.issn1226-7988-
dc.identifier.issn1976-3808-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/24889-
dc.description.abstractCurrent 4D CAD systems can perform basic functions to construct a 4D simulation to visualize a construction schedule. One important function is to link the schedule to a 3D object because it is the most basic and essential process necessary to create a 4D simulation. Though the link process in existing systems is still somewhat complicated, it can be simplified by changing the information structure of the system. Because the 4D system includes the schedule, 3D objects, and 4D simulations, the database of the system stores various information. Accordingly, information management in a 4D system is an important factor to serve the user's convenience and to simplify the link between a construction schedule and drawings. This study presents an effective information management methodology, an improved 4D system, using Work Breakdown Structure (WBS) as an information center. The artificial link process to generate a 4D simulation can be simplified by using the same WBS code for both schedule and drawing information. The suggested methodology was applied in a new 4D CAD engine developed in this study and verified by running practical data from a gas plant and a civil engineering project. The developed system enables project manager to generate a 4D simulation at WBS code level. This function can be a useful tool and a new approach to visualize schedule data in a large project.-
dc.format.extent12-
dc.language영어-
dc.language.isoENG-
dc.publisherSPRINGER-
dc.titleImproved link system between schedule data and 3D object in 4D CAD system by using WBS code-
dc.typeArticle-
dc.publisher.location미국-
dc.identifier.doi10.1007/s12205-010-0960-4-
dc.identifier.scopusid2-s2.0-78049472053-
dc.identifier.wosid000283592200001-
dc.identifier.bibliographicCitationKSCE JOURNAL OF CIVIL ENGINEERING, v.14, no.6, pp 803 - 814-
dc.citation.titleKSCE JOURNAL OF CIVIL ENGINEERING-
dc.citation.volume14-
dc.citation.number6-
dc.citation.startPage803-
dc.citation.endPage814-
dc.type.docTypeArticle-
dc.identifier.kciidART001490020-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.description.journalRegisteredClasskci-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordPlusCIVIL ENGINEERING PROJECTS-
dc.subject.keywordAuthor4D CAD system-
dc.subject.keywordAuthorvirtual reality-
dc.subject.keywordAuthorWork Breakdown Structure (WBS)-
dc.subject.keywordAuthorschedule-
dc.subject.keywordAuthor3D object-
Files in This Item
There are no files associated with this item.
Appears in
Collections
건설환경공과대학 > 건설시스템공학과 > Journal Articles
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Chang Hak photo

Kim, Chang Hak
건설환경공과대학 (건설시스템공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE