Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

Full metadata record
DC Field Value Language
dc.contributor.author윤석헌-
dc.contributor.author김상철-
dc.date.accessioned2022-12-27T02:20:10Z-
dc.date.available2022-12-27T02:20:10Z-
dc.date.issued2012-
dc.identifier.issn1229-6163-
dc.identifier.issn2383-5575-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/22863-
dc.description.abstractIn order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS’s cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.-
dc.format.extent8-
dc.language영어-
dc.language.isoENG-
dc.publisher대한건축학회-
dc.titleStructural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project-
dc.title.alternativeStructural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.bibliographicCitationArchitectural Research, v.14, no.3, pp 109 - 116-
dc.citation.titleArchitectural Research-
dc.citation.volume14-
dc.citation.number3-
dc.citation.startPage109-
dc.citation.endPage116-
dc.identifier.kciidART001703197-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorForm-
dc.subject.keywordAuthorStructural Work-
dc.subject.keywordAuthorGuide-rail System-
dc.subject.keywordAuthorAuto-climbing System-
dc.subject.keywordAuthorSimulation-
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > School of Architectural Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Yun, Seok Heon photo

Yun, Seok Heon
공과대학 (건축공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE