Cited 47 time in
Three-Dimensional Information Model-Based Bridge Engineering in Korea
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Shim, Chang-Su | - |
| dc.contributor.author | Lee, Kwang-Myong | - |
| dc.contributor.author | Kang, Leen Seok | - |
| dc.contributor.author | Hwang, James | - |
| dc.contributor.author | Kim, Yonghan | - |
| dc.date.accessioned | 2022-12-27T01:55:12Z | - |
| dc.date.available | 2022-12-27T01:55:12Z | - |
| dc.date.issued | 2012-02 | - |
| dc.identifier.issn | 1016-8664 | - |
| dc.identifier.issn | 1683-0350 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/22336 | - |
| dc.description.abstract | Design, construction, and maintenance procedures require an integrated model that can provide an efficient collaboration environment. In this paper, three-dimensional (3D) bridge information models for bridge projects were developed to enable integrated and interoperable works throughout the life cycle of the bridge projects from planning to maintenance. In order to develop the model, object-based 3D models and neutral schema for interoperability were built for bridges considering work breakdown structures and product breakdown structures for different tasks. The constructed information models for the bridges were applied to cable-stayed bridge construction projects such as design check, structural analysis, automated estimation, four-dimensional (4D) scheduling, five-dimensional (5D) construction management, and digital mock-up. The developed information models and collaboration system can dramatically increase the productivity of the whole engineering process and reduce the risks in the project. | - |
| dc.format.extent | 6 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | IABSE | - |
| dc.title | Three-Dimensional Information Model-Based Bridge Engineering in Korea | - |
| dc.type | Article | - |
| dc.publisher.location | 스위스 | - |
| dc.identifier.doi | 10.2749/101686612X13216060212834 | - |
| dc.identifier.scopusid | 2-s2.0-84863165665 | - |
| dc.identifier.wosid | 000311979600003 | - |
| dc.identifier.bibliographicCitation | STRUCTURAL ENGINEERING INTERNATIONAL, v.22, no.1, pp 8 - 13 | - |
| dc.citation.title | STRUCTURAL ENGINEERING INTERNATIONAL | - |
| dc.citation.volume | 22 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 8 | - |
| dc.citation.endPage | 13 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Construction & Building Technology | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
| dc.subject.keywordPlus | SYSTEM | - |
| dc.subject.keywordAuthor | three-dimensional information model | - |
| dc.subject.keywordAuthor | neutral schema | - |
| dc.subject.keywordAuthor | digital mock-up | - |
| dc.subject.keywordAuthor | interoperability | - |
| dc.subject.keywordAuthor | collaboration | - |
| dc.subject.keywordAuthor | four-dimensional scheduling | - |
| dc.subject.keywordAuthor | five-dimensional construction management | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
