굴삭기 브레이커를 이용한 전석 크기의 핵석 소할 작업량 분석
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 정연득 | - |
| dc.contributor.author | 김무열 | - |
| dc.contributor.author | 김동효 | - |
| dc.contributor.author | 하만복 | - |
| dc.contributor.author | 문홍득 | - |
| dc.date.accessioned | 2022-12-26T08:00:38Z | - |
| dc.date.available | 2022-12-26T08:00:38Z | - |
| dc.date.issued | 2022-08 | - |
| dc.identifier.issn | 1738-7159 | - |
| dc.identifier.issn | 2287-3678 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/2061 | - |
| dc.description.abstract | PURPOSES : In this study, the amount of core stone breaking in the size of boulders by excavator braker work was analyzed quantitatively through on-site test construction. In addition, the factors affecting workload were studied. METHODS : In the field test, 30 core stones of boulder sizes (1–4 m3) that appeared during earthworks, such as road construction and site construction, were collected from three locations, and the rock breaking work was carried out simultaneously using three excavator breakers(1.0-m3 volume). During the core stone breaking, progress was analyzed through video recordings. RESULTS : After the completion of rock breaking, the amount of breaking work was analyzed by direct loading and weighing using a 15- ton dump truck. As a result of the test construction, there was a significant difference in the amount of work completed per hour. CONCLUSIONS : It was found that the results were greatly affected by not only the performance of the excavator braker equipment, but also the skill of the driver and the size of the core stones. | - |
| dc.format.extent | 7 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국도로학회 | - |
| dc.title | 굴삭기 브레이커를 이용한 전석 크기의 핵석 소할 작업량 분석 | - |
| dc.title.alternative | Analysis of rock breaking workload with boulder size core stone using an excavator breaker | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.7855/IJHE.2022.24.4.027 | - |
| dc.identifier.bibliographicCitation | 한국도로학회논문집, v.24, no.4, pp 27 - 33 | - |
| dc.citation.title | 한국도로학회논문집 | - |
| dc.citation.volume | 24 | - |
| dc.citation.number | 4 | - |
| dc.citation.startPage | 27 | - |
| dc.citation.endPage | 33 | - |
| dc.identifier.kciid | ART002865815 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Boulder | - |
| dc.subject.keywordAuthor | Core stone | - |
| dc.subject.keywordAuthor | Rock breaking | - |
| dc.subject.keywordAuthor | Excavator breaker | - |
| dc.subject.keywordAuthor | Workload | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.