Cited 73 time in
Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Moon, HyounSeok | - |
| dc.contributor.author | Kim, HyeonSeung | - |
| dc.contributor.author | Kim, ChangHak | - |
| dc.contributor.author | Kang, LeenSeok | - |
| dc.date.accessioned | 2022-12-26T23:16:31Z | - |
| dc.date.available | 2022-12-26T23:16:31Z | - |
| dc.date.issued | 2014-04 | - |
| dc.identifier.issn | 0926-5805 | - |
| dc.identifier.issn | 1872-7891 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/19065 | - |
| dc.description.abstract | Schedule-workspace interference is generated when workspaces that share parallel schedules and are physically adjacent to one another exist simultaneously. When workspace interference is generated, securing work performance safety is difficult and constructability can deteriorate due to increased collision risk between resources. The objective of this study is to realize an active simulation system based on building information modeling (BIM) after constructing a genetic algorithm (GA) process for an alternative schedule that minimizes the simultaneous interference level of the schedule-workspace. To accomplish this task, the impact factor of workspace interference, which simultaneously considers schedule overlap and adjacency, was analyzed. From the impact factor, an optimized algorithm based on a location-constraint GA that can minimize workspace interference is suggested. The GA visually simulates the optimization level of the execution schedule compared to the initial plan through interlock with four-dimensional (4D) computer-aided design (CAD). A 4D CAD system that can analyze workspace interference by a GA was developed, and for the developed algorithm and system, a case verification was attempted for a railroad construction project. The results show how a simple visualization-oriented BIM system can be extended to an active schedule management system equipped with decision-making functions of workspace analysis. (C) 2013 Elsevier B.V. All rights reserved. | - |
| dc.format.extent | 13 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | ELSEVIER SCIENCE BV | - |
| dc.title | Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces | - |
| dc.type | Article | - |
| dc.publisher.location | 네델란드 | - |
| dc.identifier.doi | 10.1016/j.autcon.2013.06.001 | - |
| dc.identifier.scopusid | 2-s2.0-84894901111 | - |
| dc.identifier.wosid | 000331665400009 | - |
| dc.identifier.bibliographicCitation | AUTOMATION IN CONSTRUCTION, v.39, pp 93 - 105 | - |
| dc.citation.title | AUTOMATION IN CONSTRUCTION | - |
| dc.citation.volume | 39 | - |
| dc.citation.startPage | 93 | - |
| dc.citation.endPage | 105 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Construction & Building Technology | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
| dc.subject.keywordPlus | CONSTRUCTION SITE LAYOUT | - |
| dc.subject.keywordPlus | 4D CAD | - |
| dc.subject.keywordPlus | GENETIC ALGORITHMS | - |
| dc.subject.keywordPlus | DYNAMIC LAYOUT | - |
| dc.subject.keywordPlus | OPTIMIZATION | - |
| dc.subject.keywordPlus | MODEL | - |
| dc.subject.keywordPlus | SIMULATION | - |
| dc.subject.keywordPlus | SAFETY | - |
| dc.subject.keywordAuthor | Schedule overlap | - |
| dc.subject.keywordAuthor | Workspace interference | - |
| dc.subject.keywordAuthor | Schedule-space conflict impact factor | - |
| dc.subject.keywordAuthor | Location-constraint genetic algorithm | - |
| dc.subject.keywordAuthor | 4D CAD | - |
| dc.subject.keywordAuthor | BIM (building information modeling) | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
