Developing an active resource allocation algorithm considering resource supply and demand in a construction site

Full metadata record
DC Field Value Language
dc.contributor.authorKang, Leen-Seok-
dc.contributor.authorMoon, Hyoun-Seok-
dc.contributor.authorMin, Chang-Hoon-
dc.contributor.authorKim, Sung-Keun-
dc.contributor.authorKim, Hyeon Seung-
dc.date.accessioned2022-12-26T21:50:42Z-
dc.date.available2022-12-26T21:50:42Z-
dc.date.issued2015-01-
dc.identifier.issn1226-7988-
dc.identifier.issn1976-3808-
dc.identifier.urihttps://scholarworks.gnu.ac.kr/handle/sw.gnu/17483-
dc.description.abstractLarge and complex construction projects require a timely supply of resources to reduce the construction time as well as prepare a construction plan that secures the maximum economic benefit. Because most large-scale construction sites are isolated from downtown areas, problems with the supply and demand of specific resources are frequently encountered. Previous plans with respect to resource allocation are based on uniform resource mobilization at the initial stage of construction, which is an insufficient resource supply and demand model for construction sites that have changing needs throughout the phases of construction. In this study, an active resource allocation method that the level of actual resource mobilization can be changed by the construction period is demonstrated, enabling the optimization of resource utilization to the construction site. The schedule change of resource allocation within the float time, the methods for moving a start date, the decision to increase construction time, and reasons for adjusting the width of the float time are presented in accordance with their risk level. A genetic algorithm facilitates the searching of an optimal construction schedule within the resource mobilization plan, and a case study with an example project is performed for verification.-
dc.format.extent11-
dc.language영어-
dc.language.isoENG-
dc.publisherKOREAN SOCIETY OF CIVIL ENGINEERS-KSCE-
dc.titleDeveloping an active resource allocation algorithm considering resource supply and demand in a construction site-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.doi10.1007/s12205-013-0203-6-
dc.identifier.scopusid2-s2.0-84920254114-
dc.identifier.wosid000347284300003-
dc.identifier.bibliographicCitationKSCE JOURNAL OF CIVIL ENGINEERING, v.19, no.1, pp 17 - 27-
dc.citation.titleKSCE JOURNAL OF CIVIL ENGINEERING-
dc.citation.volume19-
dc.citation.number1-
dc.citation.startPage17-
dc.citation.endPage27-
dc.type.docTypeArticle-
dc.identifier.kciidART001938329-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.description.journalRegisteredClasskci-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordPlusOPTIMIZATION-
dc.subject.keywordAuthoractive resource allocation-
dc.subject.keywordAuthorgenetic algorithm-
dc.subject.keywordAuthorresource mobilization-
dc.subject.keywordAuthorfloat time-
dc.subject.keywordAuthortarget resource profile-
Files in This Item
There are no files associated with this item.
Appears in
Collections
공과대학 > Department of Civil Engineering > Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kang, Leen Seok photo

Kang, Leen Seok
공과대학 (토목공학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE