BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Moon, Hyounseok | - |
| dc.contributor.author | Kim, Hyeonseung | - |
| dc.contributor.author | Kamat, Vineet R. | - |
| dc.contributor.author | Kang, Leenseok | - |
| dc.date.accessioned | 2022-12-26T21:46:33Z | - |
| dc.date.available | 2022-12-26T21:46:33Z | - |
| dc.date.issued | 2015-05 | - |
| dc.identifier.issn | 0887-3801 | - |
| dc.identifier.issn | 1943-5487 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/17267 | - |
| dc.description.abstract | As building information modeling (BIM) systems continue to be widely adopted, there is an increasing demand for an active construction schedule management system with more advanced decision-making capabilities. For example, if overlapping between construction activities is significant, the performance of construction operations for the corresponding activities may deteriorate. Thus, a viable construction schedule should be formulated in order to minimize overlapping of proximate construction activities. An active system can be regarded as a certain solution for this issue. The purpose of this study is to develop a systematic methodology and computer system for an optimal construction schedule simulation that minimize overlapping activities for the enhancement of a project's operational performance. This study centers on identifying overlapping activities, applying fuzzy theory, and analyzing risk levels for schedule overlap issues. In addition, genetic algorithm (GA) theory is adopted for the minimization of the overlapping of highly risky activities. Finally, an optimal construction schedule that minimizes overlapping activities is suggested. The optimal schedule is visualized in a BIM-based four-dimensional (4D) computer-aided design (CAD) environment. The 4D CAD system developed in this study includes fuzzy and GA analysis functions with a schedule simulator. A case study on an actual project is introduced to validate the effectiveness of the proposed methodology. | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | ASCE-AMER SOC CIVIL ENGINEERS | - |
| dc.title | BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps | - |
| dc.type | Article | - |
| dc.publisher.location | 미국 | - |
| dc.identifier.doi | 10.1061/(ASCE)CP.1943-5487.0000342 | - |
| dc.identifier.wosid | 000353891500005 | - |
| dc.identifier.bibliographicCitation | JOURNAL OF COMPUTING IN CIVIL ENGINEERING, v.29, no.3 | - |
| dc.citation.title | JOURNAL OF COMPUTING IN CIVIL ENGINEERING | - |
| dc.citation.volume | 29 | - |
| dc.citation.number | 3 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | sci | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Computer Science | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Computer Science, Interdisciplinary Applications | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
| dc.subject.keywordPlus | TIME-COST OPTIMIZATION | - |
| dc.subject.keywordPlus | GENETIC ALGORITHMS | - |
| dc.subject.keywordPlus | MODEL | - |
| dc.subject.keywordPlus | PROJECTS | - |
| dc.subject.keywordPlus | RISK | - |
| dc.subject.keywordPlus | MANAGEMENT | - |
| dc.subject.keywordPlus | SYSTEM | - |
| dc.subject.keywordAuthor | Scheduling | - |
| dc.subject.keywordAuthor | Computer aided design | - |
| dc.subject.keywordAuthor | Fuzzy sets | - |
| dc.subject.keywordAuthor | Optimization | - |
| dc.subject.keywordAuthor | Risk management | - |
| dc.subject.keywordAuthor | Simulation | - |
| dc.subject.keywordAuthor | Construction management | - |
| dc.subject.keywordAuthor | Active building information modeling (BIM) | - |
| dc.subject.keywordAuthor | Four-dimensional (4D) computer-aided development (CAD) | - |
| dc.subject.keywordAuthor | Schedule overlapping ratio | - |
| dc.subject.keywordAuthor | Fuzzy-based risk analysis | - |
| dc.subject.keywordAuthor | Genetic algorithm | - |
| dc.subject.keywordAuthor | Risk simulation | - |
| dc.subject.keywordAuthor | Schedule optimization | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.