Cited 0 time in
A study on generator maintenance scheduling considering renewable energy generators
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Lee, Y. | - |
| dc.contributor.author | Oh, U. | - |
| dc.contributor.author | Choi, J. | - |
| dc.contributor.author | Jung, M. | - |
| dc.date.accessioned | 2022-12-26T18:04:04Z | - |
| dc.date.available | 2022-12-26T18:04:04Z | - |
| dc.date.issued | 2018 | - |
| dc.identifier.issn | 1975-8359 | - |
| dc.identifier.issn | 2287-4364 | - |
| dc.identifier.uri | https://scholarworks.gnu.ac.kr/handle/sw.gnu/13022 | - |
| dc.description.abstract | The purpose of this paper is to establish a new optimum Generator Maintenance Scheduling(GMS) considering renewable energy generator. In this paper, the total renewable energy generation is estimated using hourly capacity factor of renewable energy generator. The GMS was optimized with the objective function of maximizing the minimum reserve rate, minimizing the probabilistic production cost, minimizing the loss of load expectation, and minimizing CO2 emissions. In the case study of this paper, GMS considering renewable energy and GMS not considering renewable energy are shown by each objective function. And it shows scenarios of the reliability, the environmental and economical factors when two nuclear power plants inputted and ten coal thermal power plants shut downed respectively. ? The Korean Institute of Electrical Engineers. | - |
| dc.format.extent | 10 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | Korean Institute of Electrical Engineers | - |
| dc.title | A study on generator maintenance scheduling considering renewable energy generators | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.5370/KIEE.2018.67.5.601 | - |
| dc.identifier.scopusid | 2-s2.0-85048669878 | - |
| dc.identifier.bibliographicCitation | Transactions of the Korean Institute of Electrical Engineers, v.67, no.5, pp 601 - 610 | - |
| dc.citation.title | Transactions of the Korean Institute of Electrical Engineers | - |
| dc.citation.volume | 67 | - |
| dc.citation.number | 5 | - |
| dc.citation.startPage | 601 | - |
| dc.citation.endPage | 610 | - |
| dc.type.docType | Article | - |
| dc.identifier.kciid | ART002344763 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | Generator maintenance scheduling | - |
| dc.subject.keywordAuthor | Genetic algorithm | - |
| dc.subject.keywordAuthor | Probabilistic production cost | - |
| dc.subject.keywordAuthor | Probabilistic reliability evaluation | - |
| dc.subject.keywordAuthor | Renewable energy generator | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
Gyeongsang National University Central Library, 501, Jinju-daero, Jinju-si, Gyeongsangnam-do, 52828, Republic of Korea+82-55-772-0532
COPYRIGHT 2022 GYEONGSANG NATIONAL UNIVERSITY LIBRARY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
